Manila escort Part 200MW photovoltaic power generation project of Texas Dingzhuang Water Conservancy Sugar daddyPhotovoltaic area construction (Segment II) has been approved by the project to determine those people. The agency agreed that the project funds are from the company’s own funds, and the bidder is Huaneng Texas New Power Co., Ltd. This project has bidding conditions and public bidding is now being carried out for construction bidding.
2. Project overview and bidding scope
(I) Overview:
The 200MW photovoltaic power generation project site of Huaneng Dezhou Dingzhuang Water Tank is located in Dingzhuang Township, western Lingcheng District, Dezhou City. Dingzhuang Water Tank is a fan of Huaneng Texas Electric Factory. In a photo of her ejaculation, she found that she was wearing a wedding ring on her fingers. This project plans the entire mountain, surface and water surface within the water tank interception area. The total planned capacity of the project is 320MW, and it is divided into two phases of the project for development after planning. This project is a phase one project, with 200MW water photovoltaics arranged. The new photovoltaic station in this phase will share a 220kV pressure lift station with the built 100MW wind power station. The 200MWp photovoltaic project is upgraded to 35kV by reverse voltage lifting unit and 35kV integrated circuit integration into the Huaneng Dezhou Dingzhuang Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ventilation Ven This phase of the project will connect the 35kV side of the 220kV lift station with 10 back 35kV lines to the 35kV side of the 220kV lift station, and build a new 200MVA (35/220kV) lift to 220kV in the lift station. The built lines of the application wind station are jointly delivered to the 220kV side of the Kanhu station. The remote area of the air-station lift station is planned to exit 3 times. The air-station has built 1 return line, and 2 return lines are reserved. The 220kV remote area uses a single female connection line. The main electric main connection line of the pressure-upgrading station in this period of the project is a single-master connection line, and the main lower pressure side adopts 2-segment single-master connection line.
This section plan will be completed on May 30, 2021.
(II) Scope:
Photovoltaic field equipment installation and adjustment: including components, inverter, 35kV box change, and electric condensing line (the box change connection line of this section, 5-way to the lift station collecting line route three-stamp <a href="https://philipThe building security of all equipment such as floating bodies, box-changing platforms and rum-fixed systems. escort installation engineering and adjustment; photovoltaic field ground level.
Lightning protection grounding: installation of main grounding network, equipment grounding in the photovoltaic field, and supply of grounding flat wires and grounding wires;
Repair route: installation and clamping of base walkway floating body, long channel floating body, short channel floating body;
Conciliation of relevant issues in this section;
Stage use and in accordance with the country and locationsManila escort‘s relevant requests to revise the temporary land use Sugar daddy‘s operational barriers.
Other equipment supply: all box-changing floating ships and floating bodies in the 100MW photovoltaic area of this section are supplied.
3. 3. Qualification request for bidders
3.1 General qualification conditions
3.1.1 The bidders are in the territory of the People’s Republic of China href=”https://philippines-sugar.net/”>Sugar babyIndependent legal persons or other organizations registered under the law, have independent support for civil and participants—answer the question, then has the ability to be responsible for their answers, and has the right to independently sign a contract;
Escort3.1.2 The bidder’s financial, trustworthiness and other aspects shall be subject to the following conditions:
(1) It has not been held in the case of being responsible for suspension of production, suspension of business or progressing into the industry, the production operation is normal and the contract performance ability is prepared;
(2) It has not been found in the period of stopping bidding by the administrative department or the relevant documents of the China Energy Group Co., Ltd. system;
(3) In the past three years, no winning or serious violations have been obtained, and no serious quality changes caused by the construction have been confirmed by relevant departments;
(4) It has not been listed by the market supervision and governance agencies in the national enterprise trust information disclosure system. It has not listed the list of trust enterprises or claims.es-sugar.net/”>Sugar baby‘s unusual business name;
(5) The list of letters of the executors has not been listed by the Supreme People’s Court on the “Reputation China” website (.cn) or various trust information sharing platforms.
(6) A legal person, other organization or individual who has a short-term relationship with the bidder can affect the fairness of the bidder shall not participate in the bidding; a unit responsible person shall not participate in the bidding bid for the unified bid or may not be a single person or a disagreement unit that may have a controlling or governance relationship.
3.2 Special qualification conditions:
3.2.1 The bidder shall have the first level or above for power engineering construction general contracting or water conservancy and hydropower engineering construction general contracting and the first level of Sugar daddy qualifications, with Sugar daddy baby has a safe production license issued by the construction administrative department and is within its useful period.
3.2.2 The bidder has been since January 2016 Sugar baby From the 1st to the present day (based on the date of contract signing), there are up to 3 similar projects (collapse areas, sunlight complementation, swamps, tide belts, water photovoltaics and other similar projects), with a single contract amount of no less than 40 million. (The above-mentioned business results need to be supplied to the contract scanned parts or completed Experience and receive reports, otherwise it will be processed as invalid business results).
3.2.3 The bidder’s project manager must obtain a first-class registered construction engineer (machining and electrical engineering or construction engineering professional) qualification certificate issued by the construction department and a “Ping Safe Production Inspection and Qualification Certificate issued by the provincial and below administrative departments Sugar daddy” (Category B); in the past three years (January 1, 2018 to present), similar engineering performances have been completed with project manager components, and must be accompanied by a copy of the company’s document, or a copy of the contract or a scanned copy (if certified), otherwise it will be processed as invalid performance.
3.2.4 This bid does not accept any circumstances of the bidding and participate in the bidding.
4. Acquisition of bidding documents
4. Acquisition of bidding documents
>Sugar babyGet time: from 9:00 on February 10, 2021 to 17:00 on February 27, 2021.
Getting method:
4.1 Purchase: Tender documents can be purchased online from 9:00 on February 10, 2021 to 17:00 on February 27, 2021 (Beijing time, the same below). Click the “Buy